Discussion in 'Project Server' started by hmhart, Oct 14, How do I change assignment owner on project 2010 assignment owner where owner name is assignment owner out?
I need to change the assignment owner of a bunch of tasks from one assignment owner to another, but the assignment owner assignment owner is grayed out. The assignments in question are local resources. The previous owner is a resource ID being removed from the system, but is still active until we project 2010 remove everything.
Assignment owner to-be owner is the /somebody-help-me-my-science-homework-are-killing.html manager. If I add an "assignment owner" column to a task view, those specific to the local resources are grayed out and cannot be changed.
So no change can be made there. I made one of the local resources an enterprise resource all of these should have project 2010 added as enterprise. I used the "replace" function to replace the project 2010 assignment owner with the enterprise resource by the same name.
Same problem with the assignment owner column in a task view. I would click the dropdown for the project 2010 assignment owner, then the "resource owner" field would blank out. Project 2010 assignment owner I could not enter anything assignment owner that field.
At this point, I did not save the task changes, nor did I save the project for fear of ruining it. It belongs to a project manager.
I do have full access to the Project Server databases and can perform repairs at that level if that is the only place. But assignment owner the read more interconnection of everything, I won't do that on project 2010 assignment owner own. Any ideas would be appreciated.
Thanks, Mac Hart Software Engineer. Local resources do not use PWA to report progress, thus, the Assignment Owner field cannot be edited.
2018 ©